League Park II was located near Summit Lake along Lakeshore Blvd. between W. Long St. and W. Crosier St. in Akron, Ohio.
League Park II was located near Summit Lake along Lakeshore Blvd. between W. Long St. and W. Crosier St. in Akron, Ohio.
The original League Park was located at the corner of Carroll St. and Beaver St. in Akron, Ohio.
The Summit County Infirmary – also known as the County Poorhouse – stood from 1865 to 1919 off West Exchange Street near the present site of Westminster Presbyterian Church between Rose Boulevard and Mull Avenue. A Hellish Place When the Infirmary opened it was praised as “an honor to the county and a mark on the…
100 outside fireproof rooms with bath. Modern cocktail bar and Clark restaurant.
Magnificently modern in concept, comfort, convenience – 200 luxury rooms – Free inside parking – Swimming pool – Restaurant. 50 West State St. Akron 8 Ohio Telephone: 762-0451 Teletype AK84
The Crescent Line Boat Landing was part of Lakeside Park (established in 1877). Lakeside was the first picnic ground at Summit Lake. Eventually, the operation would be absorbed by Summit Beach Park.
The high school was located on Forge Street, between College and Union Streets, facing Union Park. The school was established in 1857, but the pictured building was erected in 1885 at a cost of $135,000. The school was renamed Central High after the 1911 construction of South High.
With roots as a mission church visited by Father Basil A. Shorb, pastor of St. Francis Xavier Church, Doylestown, in 1837, St. Vincent de Paul parish is the oldest church in Akron. The current building (pictured here) dates back to 1867.
Silver Lake Park was created originally as a picnicking and swimming area but quickly grew into an amusement park featuring animal exhibits, a roller coaster, sports facilities, a dance hall, and a hotel. In its prime, the Park received over 10,000 visitors per day.
Positioned on the east shore of Summit Lake, Lakeside Park was opened in 1877 by the Akron Street Railway & Herdic Co. as a picnic grounds. The growth of Summit Beach Park eventually absorbed Lakeside Park.
In May 1881, the Wooster Avenue Water Works was put into service on the Mallison Farm. Water was supplied from a large well 50 feet in diameter and 30 feet deep at the pumping station. This view shows the works after considerable addition to the original structure.